
Dodge ISB 5.9L Cummins Banks Stinger System Installation Instructions for year 2003-2004, General Installation
Practices : For ease of installation of your Banks Stinger, familiarize yourself with the procedures by reading the
entire manual before starting work. This instruction manual contains 24 pages of text, illustrations and parts listing. 2. Disconnect the ground cable from the battery before beginning work. If there are two batteries, disconnect both. EXHAUST REMOVAL Important: DO NOT DAMAGE CATALYTIC CONVERTER TUBING DURING THE REMOVAL PROCESS. TURBOCHARGER REMOVAL, THERMOCOUPLE INSTALLATION 9. The thermocouple monitors the temperature of the exhaust gases entering the turbocharger at the turbine housing. Installation requires that the exhaust manifold be drilled near the outlet of the manifold adjacent to the turbine housing. General Assembly Diagram, FOR 2003 VEHICLES ONLY: Locate the large black electrical connector (C130) on the driver side between the battery and the firewall. See Figure 6. Remove the two (2) plastic screws on the sides of the connector and move the connector aside. Retain the two (2) screws and the two (2) retainers for re installation.

Tags:plastic screws, exhaust gases, assembly diagram, installation practices, ground cable
If you see unrelated pdf files with the description or copyrighted material published, please report to us, we'll correct/delete it it as soon as possible.NONE OF THOSE MATERIALS ARE HOSTED IN THIS SERVER NOR UPLOADED BY ME IN SOMEONE'S SERVERS.  Read our DISCLAIMER for more detail.
We are neither affiliated with authors and brands nor responsible for its content and change of content.
Information contained herein is provided "as is" without warranty of any kind, either expressed or implied, including any warranty of merchantability or fitness for a particular purpose. In no event shall ANYONE be held liable for any loss of profit, special, incidental, consequential, or other similar claims.